Used the geophysical prospecting of High-density electrical method to detect the 550kv of Huainan Kongdian Substation site’s concealed faults and implement the project site near field geological survey. Finally a fault was found to come across the middle of the field. The evaluation of the engineering influence concludes the fault may be a threat and suggests the investors to use take preventive measures. |